The 10th Avenue Marine Terminal, one of the largest commercial marine facilities in San Diego Bay, is a 2,600-foot-long facility that was constructed in 1956 with a design water depth of 36 feet, MLLW.
San Diego, CA
Blaylock Engineering Group
Download Project Sheet (.pdf)